St. Andrews Lutheran Church
Park Ridge, Illinois
Opus 88, 2009
Construction Photos
Kent prepares to drill the toeboards of the Swell windchest.
The manual rollerboards.
Some completed woodwork: the floor frame and the lower case front.
Randy installs doors to the lower case back.
Randall fits swell shades in their frame.
In addition to the organ, we are building new chancel furniture, including the altar pictured here.
Planing the edge of a door in the base of the altar.
The baptismal font.
We have also made a screen that incorporates carvings from the previous altar.
The case is being set up, with Kent locating the swell shutter front on the right, or C#, side.
Op. 88 Installation
Op. 88 Home